Cloud-Based Automation for DATA CENTERS AND HYPERSCALERS
Automated Fiber Management & Testing for
Schedule a Demo
2x Growth expected in US data center construction from 2023 to 2029
6,912 Fiber Strands being deployed in data centers with 16x capacity increase
Hyperscalers I AI Workloads I Cloud Adoption I Fiber Connectivity
Improve Network Reliability, Lower OpEx, and Improve Asset Tracking… with ECSite Automation
With automated fiber testing, data centers can deliver unmatched reliability, speed, and efficiency to support the demands of AI-driven workloads.
80%
faster testing
99%
Error Reduction
70%
LOWER OpEx
Increase Uptime
Keep all AI and computational workloads running without interruption.Enhance Performance
Ensure optimal fiber performance even under the highest workloads.Lower Operational Costs
Efficient automation to eliminate the need for manual testing and asset tracking.Areas of Impact for ECSite Fiber Test Automation in Data Centers
Our sophisticated AI platform automates and streamlines the fiber testing lifecycle while tracking fiber capacity:
Deployment Verification
Verify fiber integrity upon installation to enhance performance and mitigate issues.Performance Monitoring
Provide real-time, continuous monitoring and performance metrics, detecting issues before they affect workloads.Fault Detection and Localization
Utilizes machine learning to detect fiber faults and pinpoint exact locations for quicker resolution.Predictive Maintenance
Analyze historical data to anticipate failures, allowing for preemptive repairs and minimizing unexpected downtimes.Our Automation is Used in Several Marquee Networks
Allegiant Stadium
SoFi Stadium
Climate Pledge Arena
AT&T Cowboys Stadium
Disney/Universal Studios
Jacksonville Airport
Case Studies
Testing and Measurement of Public Safety Networks
ECSite was used for the testing and measurement of Public Safety Networks custom-built for the warehouses of the world’s largest online retailer.Read the Case Study
Zero to Seventy in One Day
ECSite’s platform was recently used to enable data collection for seventy poles and take the closeout pictures required by the carrier.Read the Case Study
Excellent Improvements in Payment Cycle Time
Incorrect COPs may result in return visits to the site, re-work by project managers and administrators, strain on business relationships, and a concurrent delay in payment.Read the Case Study